為了提高山東通風(fēng)管道加工的工藝,不同的產(chǎn)品有不同的加工工藝和不同的質(zhì)量。提高產(chǎn)品的加工工藝對我們有很大的好處。只有不斷提高整體加工技術(shù),才能在質(zhì)量上有更好的保證,這是我們今后更好使用產(chǎn)品的保證。你真的應(yīng)該注意到這一點(diǎn),畢竟,這真的關(guān)系到我們未來的使用。
In order to improve the processing technology of Shandong ventilation pipeline, different products have different processing technology and different quality. It is of great benefit to us to improve the processing technology of the products. Only by continuously improving the overall processing technology, can we have a better guarantee in quality, which is the guarantee of our better use of products in the future. You should really notice that, after all, it really matters to our future use.
山東通風(fēng)管道
Shandong ventilation pipeline
通風(fēng)管道安裝時(shí)應(yīng)具備哪些條件?
What conditions should be met in the installation of ventilation duct?
1.與管道有關(guān)的土建工程經(jīng)檢查合格,滿足安裝要求;
1. The civil engineering related to the pipeline has passed the inspection and met the installation requirements;
2.設(shè)計(jì)資料及其他技術(shù)文件齊備,施工圖已經(jīng)會(huì)審,施工組織設(shè)計(jì)編制完畢并有批準(zhǔn)才可以;
2. The design data and other technical documents are complete, the construction drawings have been reviewed, and the construction organization design is completed and approved;
3. 通風(fēng)管道生產(chǎn)廠家告訴大家與管道連接的設(shè)備安裝需要就位固定完畢,標(biāo)高、中間線、管口方位符合設(shè)計(jì)要求;
3. The manufacturer of the ventilation pipe told us that the equipment connected with the pipeline should be installed in place and fixed, and the elevation, middle line and nozzle orientation should meet the design requirements;
4.須在管道安裝前完成有關(guān)工序,如清洗、脫脂、內(nèi)部防腐與襯里等已進(jìn)行完畢;
4. Relevant procedures must be completed before pipeline installation, such as cleaning, degreasing, internal anti-corrosion and lining;
5.管子、管件及閥門等已經(jīng)檢驗(yàn)合格,并具備有關(guān)的技術(shù)證件;
5. Pipes, pipe fittings and valves have been inspected and qualified, and have relevant technical certificates;
6.管子、管件及閥門等已按設(shè)計(jì)要求核對無誤,內(nèi)部已清理干凈,不存雜物;
6. The pipes, pipe fittings and valves have been checked according to the design requirements, and the internal parts have been cleaned up and there is no debris;
7.地下管溝開挖完畢,裝置管廊施工完畢。
7. The excavation of underground pipe trench is completed, and the construction of plant pipe gallery is completed.
上一篇:濟(jì)南通風(fēng)管道的類型及通風(fēng)管道的具體作用介紹
下一篇:山東通風(fēng)管道在加工過程中有哪些缺陷?